MARKET SIZING & FORECASTING | ILLUSTRATION 01

Automated Shore-Power Connections at Mediterranean Ro-Ro Berths

Sizing a berth-level retrofit opportunity shaped by regulation, electrical readiness and procurement timing.

MARKET QUESTION
What is the addressable retrofit market for automated shore-power connection equipment at Mediterranean Ro-Ro and ro-pax berths through 2032?

The commercial decision

Whether an equipment supplier should build a dedicated Mediterranean commercial programme, which port groups to prioritise and how much installation capacity to reserve.

Why the market is difficult to size

  • A port count does not reveal how many individual berths are suitable for automated connection equipment.
  • Shore-power availability, vessel call patterns, berth geometry and electrical interfaces mature on different schedules.
  • Publicly announced projects do not always disclose the connection method, procurement package or installation year.

Scope boundary

INCLUDED

EXCLUDED

Automated cable-management and vessel-connection equipment, berth-side integration and commissioning at eligible Ro-Ro and ro-pax positions.

Grid reinforcement, substations, vessel retrofits, civil works outside the berth package and container-only or cruise-only terminals.

214
berth positions screened

49
base-case procurement berths

EUR 41.7m
2027-2032 cumulative market

Illustrative model output. Values demonstrate the analytical structure and are not presented as a published market total.

MODEL ARCHITECTURE

Regulatory Berth Conversion Model

MODEL EQUATION Berth positions x operating relevance x shore-power timing x automated-connection fit x procurement year x system value

Illustrative model output. Values demonstrate the analytical structure and are not presented as a published market total.

How existing information enters the model

EVIDENCE LAYER

WHAT IS ASSEMBLED

MODEL ROLE

Berth universe

Port directories, terminal layouts and Ro-Ro service patterns

Creates the position-level denominator

Conversion eligibility

Shore-power projects, electrical interfaces and berth configuration

Removes berths that cannot support the package

Procurement timing

Funding awards, tenders, planning milestones and construction windows

Moves demand into realistic contract years

System value

Equipment scope, integration content and comparable berth packages

Separates connection equipment from full port infrastructure

WHY THIS APPROACH FITS The denominator, eligibility rules, timing mechanism and value logic are specific to this decision. A published headline market is used only as a reasonableness check, never as the calculation route.

ILLUSTRATIVE MODEL OUTPUT

The market is a sequence of berth conversions, not a regional CAGR

Illustrative model output. Values demonstrate the analytical structure and are not presented as a published market total.

What the model indicates

  • Only 49 of 214 screened berth positions enter the base procurement window after operating relevance, project timing and physical fit are applied.
  • The base case produces EUR 41.7 million of cumulative equipment and integration value from 2027 to 2032.
  • Annual revenue peaks when port programmes cluster. A six-year cumulative range is therefore more decision-useful than a smooth growth rate.

Scenario range

SCENARIO

MODEL OUTPUT

CONDITION

Downside

EUR 27m

Slower port awards and more manual connections

Base

EUR 41.7m

49 berth packages proceed in the modelled window

Upside

EUR 56m

Earlier funding and broader automation fit

INTERPRETATION The range changes named model parameters. It is not created by adding an arbitrary percentage above and below the base case.

DECISION IMPLICATIONS

What the market model changes

DECISION A focused commercial programme is supportable, but capacity should follow named berth programmes rather than a generic Mediterranean sales target.

Recommended commercial response

  • Prioritise terminal groups with several eligible berths and a shared electrical architecture.
  • Separate early design support from later equipment revenue so the opportunity is not overstated.
  • Track funding and tender milestones as leading indicators; vessel traffic alone cannot time the market.

Uncertainty and refresh triggers

TRIGGER

WHY IT MATTERS

Port award timing

Moves berth packages between years

Connection specification

Changes automated-equipment eligibility

Integration scope

Changes average value per berth

Vessel compliance path

May reduce or accelerate shore-power use

What August Research would deliver

  • Berth-level opportunity ledger
  • Country and port-group prioritisation
  • 2027-2032 procurement forecast
  • Base, upside and downside capacity plan

CONTACT US Tell us which market decision must be supported, the scope currently being counted and where available estimates fail to explain the opportunity. August Research will build the boundary, evidence routes and forecast around that decision.

Let’s Discuss Your Project

If a similar decision is ahead of you, August Research can build a Market Sizing & Forecasting engagement around the conditions that matter most.

Get in Touch →